KAMPALA, UGANDA · MANUFACTURING
Gentex Enterprises
Power stabilisation that lifted production 30%.
The brief.
Gentex runs manufacturing lines in Kampala on a grid that can’t promise a full shift. Ariya’s answer was a 2.6 MWp solar PV system paired with 2.6 MWh of battery storage and full power stabilisation. Voltage and frequency are corrected before they ever reach a machine.
The stabilisation solution ensures genuinely uninterrupted power: when the grid sags or disappears, batteries take the load the same second. Since commissioning, production is up 30% and Gentex’s delivery reliability has become a competitive edge.
See it running.
More from the fleet.
All projects + map →
Pee Pee Tanzania
1.25 MWp + 2.0 MWhSmart load-shedding through outages. Output up 40%.
Talus Renewables
2.1 MWp + 764 kWhA hybrid AC + DC system running American-spec process equipment.
Thika Cloth Mills
1 MWp1.52 kt of CO₂ offset. The equivalent of 144,023 trees.
Solar PV
Battery Storage
Power Stabilisation
O&M
Gentex · Uganda