TANGA, TANZANIA · MANUFACTURING
Pee Pee Tanzania
Smart load-shedding through outages. Output up 40%.
The brief.
PPTL’s Tanga plant combines a 1.25 MWp solar array with 2.0 MWh of storage and a power stabilisation system that does something clever during outages: prioritised load shedding. Critical lines keep running at full speed while deferrable loads wait their turn.
The smart integration paid off fast. Production was up 40% by July 2024, with the plant riding through grid events that used to cost whole shifts.
See it running.
Seamless power in Tanzania, with the Confederation of Tanzania Industries
More from the fleet.
All projects + map →
KAMPALA, UGANDA · MANUFACTURING
Gentex Enterprises
2.6 MWp + 2.6 MWhPower stabilisation that lifted production 30%.
NAKURU, KENYA · TEXTILES
Spin-Knit
720 kWpSolar by day, seamless genset switchover by night.
TATU CITY, KENYA · COLD CHAIN
Cold Solutions
1.4 MWpEast Africa’s largest cold-storage campus, on sunshine.
Solar PV
Battery Storage
Power Stabilisation
O&M
Pee Pee · Tanzania
Talus · Kenya